1  In the case of severe weather such as high wind of 6 or above in the open air, heavy snow, fog and so on, the lifting operation shall be stopped. After rain and snow, the lifting operation shall be tested before operation, and the brake can be carried out after confirming that the brake is sensitive and reliable.

2  When working under the transmission line, the distance between the boom, sprig, auxiliary device and wire rope and the transmission line should meet the relevant standards of the power department.

1), Transmission line voltage below 1kV, the minimum distance is 1.5m.

2), Transmission line voltage 35kV, the minimum distance is 3m.

3), Transmission line voltage 60kV, the minimum distance is [0.01(V-50)+3]m.

3  The operation must be carried out within the specified rated load radius, and overloading is strictly prohibited.

4  Operators should send out warning signals before carrying out crane rotation, luffing, walking and lifting hook.

5  During operation, no one is allowed to stay, work or pass under the boom and heavy objects. When heavy objects are lifted, no one is allowed to pass over the crowd or carry people.

6  Safety protection devices shall not be adjusted or removed at will. It is strictly prohibited to replace the operating mechanism with the cargo limit device of limiter.

7  It is strictly forbidden to use cranes to pull, lift or lift heavy objects buried in the ground and other objects of unknown weight. Concrete members or templates poured on site must be loosened before lifting.

8  lifting heavy objects should be bound and smooth, firm, shall not be piled up again on weight or scattered objects, hanging hanging cage bars should be used easily scattered objects fixed rear can lifting, marked position of pipe network, should press mark tie after lifting, sling with objects of appropriate USES 45 to 60 Angle, and shall not be less than 30 , sling with objects should add block between spindle Angle.

9  When the lifting load reaches 90% or more of the rated lifting weight of the crane, the heavy object should be lifted 200-500mm above the ground first, then check the stability of the crane, the reliability of the brake, the smoothness of the heavy object and the firmness of the binding, and then continue to lift after confirmation.The pull rope should be fastened to the heavy objects that are easy to shake.

10  When the lifting load reaches 90% or more of the rated lifting weight, the lifting action should be carried out slowly, and it is forbidden to carry out two or more actions at the same time, and it is forbidden to drop the lifting boom.

11  The amplitude of the crane should be slow and steady, and it is strictly prohibited to change gear before the boom stops.

12  In the process of lifting heavy objects, operators should put their feet on the brake pedal and pay close attention to lifting heavy objects to prevent the hooks from sliding;When the gear crane stops running and the weight is still hanging in the air, the foot should still be placed on the brake pedal.

13  It is strictly forbidden to hang heavy objects in the air for a long time. In case of sudden failure during operation, measures should be taken to land heavy objects to a safe place, and the engine should be shut down for maintenance.

 