How to do a good job of safe transportation of Crawler Crane

Dec 31,2021

Unlike Truck crane, Crawler Crane has a slow speed and unable to travel on road. Transport Crawler Crane is very test equipment technology. The whole equipment needs to be disassembled, reloaded transport, to the construction site after reassembly. Every step needs to be careful, just the Crawler Crane host on the truck has occurred many accidents. Crawler Crane is a special equipment, except that the weight of the main engine is much heavier than the ordinary truck. A little careless accident may occur, the equipment and personal caused unnecessary injuries.

In strict accordance with the construction process before transportation, drive the Crawler Crane into the site for inspection, then prepare the route to be transported, to ensure that the route is smooth and feasible, and the shortest distance. Then check if the destination site is in line with the road level, no hidden danger of collapse, no obstacles. That’s when we will be ready to transport our Crawler Crane.

The Crawler Crane transportation needs to disassemble into several parts firstly, and then transport them separately.  Firstly, the hook should be disassembled, then section by section to remove the boom and other heavy pieces, pins, reimbursement, and other income from container, using a Truck crane to lift to the transport truck.

After the ramp of the movable plate is set up, the main engine of the Crawler Crane will board the trolley from the rear and drive slowly and in a straight line. At the same time, the left and right eyes will observe the distance between two crawler tracks, which can’t be deviated. The technique of the operator is the most tested, there has to be a scout around to check the safe distance. When the Crawler Crane login half of the time, the entire host will be in a semi-suspended state, operators to maintain a good Crawler Crane equipment overall balance, to avoid rollover.

After the Crawler Crane arrives at the scene with transport vehicle, the main engine will drive down by itself from transport vehicle. At the same time. There must be a special person around to conduct, to ensure that the two Crawler tracks run evenly on the movable board. The hook, counterweight block, main crane and so on use the special crane to unload the crane, each part is classified and stacked on the open ground site, ready to install, pay attention to the installation sequence, the entire transport process is completed.

crawler crane undercarrige parts