Track Shoes

Keyword:

Products News

Matters Needing Attention When Pouring Track Shoes!


1. Speed: for track shoes solidified at the same time, a faster speed shall be adopted. For track shoes solidified in sequence, use a slower speed. 2. Temperature: the pouring temperature range should be determined according to the alloy type, casting structure and mold characteristics. 3. Two tips: (1) When pouring large and medium-sized crawler shoes, the molten steel shall be poured after standing in the ladle for 1min ~ 2min. (2) After the track shoe solidifies, remove the pressure device in time to reduce the shrinkage resistance and avoid cracks on the track shoe.

China Liebherr LR1750 Track Pads for Lattice Boom Crawler Cranes

China Liebherr LR1750 Track Pads for Lattice Boom Crawler Cranes


We specialize in produce and export Crawler crane Undercarriage parts for more than 10 years, such as Track shoe, Lower roller, Top roller, Sprocket, Idler

Shipment Of Sumitomo SC800 Track Shoes

Shipment Of Sumitomo SC800 Track Shoes


Shipment of Sumitomo SC800 Track Shoes, Track Pads, Track Plates, Track link Assy

Shipment of China SCX800-2 Track Shoes for HITACHI-SUMITOMO Crawler Cranes

Shipment of China SCX800-2 Track Shoes for HITACHI-SUMITOMO Crawler Cranes


HITACHI-SUMITOMO SCX800-2 Crane Track Shoes, Track Paads, Track Plates, Track Link Assy

Shipment Of Hitachi Sumitomo SCX2500 Crawler Cranes Track Shoes


Hitachi Sumitomo SCX2500 Crawler Cranes Track Shoes, Track Pads, Track Plates